Method and sources
How we get our numbers: sources, dates and limits
Every number on this site belongs to someone else: a federal agency, a city, a licensing board or a named survey. We show it with the publisher, the date and a link, so you can check it yourself. We never publish a price or a price range of our own, and we never blend several sources into one figure.

In short. Wages come from the U.S. Bureau of Labor Statistics (May 2025 estimates), material price trends from the BLS Producer Price Index (September 2026, preliminary), what owners spent from the 2023 American Housing Survey, permit fees from each city's own fee schedule, and license counts from the California and Texas licensing boards' data files. All of them were read or downloaded on November 4, 2026.
Why a cost site should show its sources
Most cost guides online print a single range for a project and leave you to guess where it came from. Some build it from what their own customers paid, some from estimating books, some from a mix they do not name. Fixr, for example, says it takes local prices from cities whose costs are in line with the national average and does not show local costs for markets that are much more expensive, naming New York City and Boston (Fixr, Methodology and Sources). A figure built that way can sit far from a bid in San Jose.
We have no marketplace of jobs and no customer price records, so we will not pretend to. What we can do is put public records for the two regions we cover side by side and say plainly what each one measures. That makes the numbers smaller in number but easier to trust.
Where each kind of figure comes from
| What you see | Publisher and data set | Date used | How often it changes |
|---|---|---|---|
| Hourly wages by trade | U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics (OEWS), by metro area | May 2025 estimates | Once a year, each spring |
| Material price trends | BLS Producer Price Index for gypsum products, ready-mix concrete and architectural coatings | September 2026 (preliminary) | Monthly, revised for four months |
| What owners spent on projects | U.S. Census Bureau and HUD, American Housing Survey, Home Improvement Costs table | 2023 survey (spending in 2021 to 2023) | Every other year |
| Permit fees | Each city's published fee schedule: San José, San Francisco, Dallas, Fort Worth | The schedule in effect on November 4, 2026 | Usually each fiscal year |
| License counts | Contractors State License Board data portal; Texas Department of Licensing and Regulation All Licenses file | Downloaded November 4, 2026 | Daily at the boards |
| Builder cost shares | National Association of Home Builders, Cost of Constructing a Home | 2024 survey, published January 2025 | Every few years |
Government data sets are labelled official on the page. A trade group's or a company's survey is labelled as a survey and named, because its sample and its aims are its own. The working files we read the figures from, with the BLS series codes and the board file dates, are kept with the site so any figure can be traced back.
What a wage figure is, and what it is not
The BLS wage tables show what employees in a trade earn per hour in a metro area: the median, and the 25th and 75th percentiles, which bracket the middle half of workers. They are the most neutral local labor numbers that exist, and they show something no national cost guide does: an electrician in the San Jose metro area and one in Dallas–Fort Worth are paid very different amounts for the same hour.
A wage is not what a contractor charges you. A contractor's hourly rate or bid adds payroll taxes, workers' compensation insurance, the license bond, vehicles and tools, office time, estimating time that is never paid for, and profit. We do not publish a markup figure, because no official source gives one for remodeling. Use the wage tables to understand why bids differ between regions and between trades, not to work out what a bid should be.
Bay Area and Dallas–Fort Worth are shown apart
We never average the two regions together. Where a source has local figures, the page shows the San Francisco–Oakland–Fremont and San Jose–Sunnyvale–Santa Clara metro areas, which together cover most of the Bay Area, next to the Dallas–Fort Worth–Arlington metro area. Where a source is only regional, we say which region: the American Housing Survey groups California with Oregon, Washington, Alaska and Hawaii in its Pacific division, and Texas with Louisiana, Oklahoma and Arkansas in West South Central. Those are wider than our two metros, so the page says so next to the number.
Price indexes show direction, not prices
A Producer Price Index tracks what producers charge for a product over time, as an index number, not dollars. We use it to answer one question: has this material become more or less expensive, and by how much? For example, the gypsum products index was 49.3 percent higher in September 2026 than in January 2020. That tells you why a drywall bid from before 2020 is no guide today. It does not tell you what a sheet of drywall costs at a store, and the pages never present it that way.
What license counts count
The license-count page tallies active licenses by trade and county from the boards' own files. For California, that means licenses with a clear status whose address of record sits in each of the nine Bay Area counties. For Texas, it means unexpired TDLR licenses by the business county listed in the file. We keep counts only. We do not copy names onto this site and we do not build a page for any contractor; the boards' own search pages are linked for that.
Permit fees are quoted as printed
A permit fee table is quoted line by line, with the schedule's name and effective date, and we do not total a fee for your project. Cities add plan check, technology fees, construction taxes and school or impact fees that depend on the details, so the only reliable total is the one the city gives you.
What we never do
- Publish a price, a price range or a "typical cost" as our own, or estimate one with software and present it as data.
- Blend sources into one number. When two sources disagree, both appear side by side with their dates.
- Copy cost tables from other cost-guide sites. A single cited figure with its link is a citation; a rebuilt table is copying.
- Use RSMeans or other licensed estimating data without a written license.
- Name a contractor next to a price, post ratings, or say anyone is vetted or approved.
Updates and corrections
When a source publishes new figures, the page that uses them is updated and its date changes. Wage tables move once a year after the BLS spring release, price indexes and license counts are refreshed from the source files, and fee schedules are checked when cities adopt new budgets. If you find a figure that is wrong or out of date, write to [email protected] with the page and the source you are looking at. We correct the page and keep the source link, so the fix is checkable too.
Contractors Near Me is a free request service, not a contractor. If you want to talk through bids you already hold, call us.
Tell us about the project
Spotted a figure that looks out of date, or want to talk through bids you already have? Send a line. We phone or email you back, and a request costs nothing.
Questions about our numbers
Why don't you publish your own prices for remodeling work?
We are a free request service, not a contractor, and we have no records of what jobs in your area cost. A price we made up would look precise and be wrong. Instead we show public figures from named sources, with dates and links, and explain what each one measures.
How often are the wage, price index and license figures updated?
Wage figures change once a year, after the Bureau of Labor Statistics releases its May estimates in the spring. Price indexes come out monthly and are revised for four months. License counts and fee schedules are refreshed from the boards' and cities' own files. Each page shows the date of the figures it uses.
What do you do when two sources disagree about a cost?
We show both, side by side, each with its publisher, date and method, and explain why they differ, for example a survey median that includes do-it-yourself projects next to a figure for professional work. We never average them into a new number of our own.
How can I report a figure that looks wrong?
Email [email protected] with the page address and the source you are comparing it with. We check the figure against the original publisher, correct the page if needed, and keep the source link so the correction can be checked as well.
Sources: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics and Producer Price Index; U.S. Census Bureau, American Housing Survey; CSLB, Data Portal; TDLR, All Licenses (data.texas.gov); NAHB, Cost of Constructing a Home 2024; Fixr, Methodology and Sources. All read November 4, 2026.