Tool · bid comparison
Compare contractor bids side by side: a worksheet and what to line up
To compare contractor bids fairly, have every contractor price the same written scope, then compare them line by line rather than by the total. California's licensing board advises getting at least three written bids on identical plans and being wary of a bid far below the rest. The worksheet below lines the bids up for you.

The bid worksheet
Copy each contractor's amounts into the matching lines. If a bid lumps several lines into one, put the amount on the closest line and leave the others empty; the notes under the table will show which lines are missing from which bid.
| Line in the bid | Bid A | Bid B | Bid C |
|---|---|---|---|
| Demolition and removal | |||
| Materials and fixtures | |||
| Labor | |||
| Subcontracted trades | |||
| Allowances for items not yet chosen | |||
| Permits and city fees | |||
| Clean-up and haul-away | |||
| Anything else listed | |||
| Total of the lines | – | – | – |
What the worksheet notices
The worksheet only adds up what you type and compares the bids with each other. It does not know what your job should cost, and it never suggests a price. Nothing is saved: closing or reloading the page clears it.
Before you compare: make the bids describe the same job
Bids that look far apart are often pricing different work. Before the numbers mean anything, check that every contractor bid on the same scope.
- One written scope for everyone. The same drawings or room-by-room description, the same list of what stays and what goes, the same finish choices. The Contractors State License Board advises bids based on identical plans, specifications and scope (CSLB, How Do I Find the Right Licensed Contractor?).
- The same units. One bid per square foot, another per hour and a third as a lump sum cannot be compared until they are converted to the same basis.
- The same pricing method. A fixed price and a cost-plus estimate are different promises; see general contractor cost for the methods.
The lines that decide which bid is really lower
Allowances
An allowance is a placeholder amount for something not chosen yet, such as tile or light fixtures. A bid with small allowances looks cheaper until you pick real products and pay the difference. Compare each allowance and ask whether it covers installation or only the material.
Exclusions
Read what each bid leaves out: permits, haul-away, painting after drywall, repairs found behind walls, appliance hook-ups. A short exclusion list on a low bid is a question to ask, not a bargain.
Permits and fees
Who applies for the permit and who pays the city? Fees differ widely by city: building permit cost quotes the San José, San Francisco, Dallas and Fort Worth schedules.
Unforeseen conditions and change orders
Ask how hidden damage will be handled and how changes will be priced. In California, changes go in written change orders with their price (CSLB, Contracts and Binding Agreements).
Schedule and payments
Compare start dates, the length of the job and the payment schedule. In California the down payment on a home improvement contract may not exceed 10 percent of the price or $1,000, whichever is less, and the contract must be in writing when it is over $500.
Why bids differ between the Bay Area and Dallas–Fort Worth
If you are comparing a bid with a figure you read online, or with a friend's job in another region, check whose labor market it came from. In May 2025 the median plumber earned $51.71 an hour in the San Jose metro area and $29.45 in Dallas–Fort Worth, by the Bureau of Labor Statistics' count. Comparing bids only makes sense within one market. The labor rates table shows 12 trades in both regions.
Warning signs in a bid or a sales pitch
The Federal Trade Commission advises getting several estimates and not automatically choosing the lowest bidder, and lists warning signs (FTC, How To Avoid a Home Improvement Scam):
- A contractor at your door saying they are in the area or have leftover materials.
- Pressure to decide on the spot.
- A demand for full payment up front, or cash only.
- A request that you get the required building permits yourself.
- A push to finance through a lender the contractor knows.
Before you sign, check the license: in California on CSLB's Check A License page, in Texas with the TDLR license search for electrical and air conditioning work and the plumbing board for plumbers. The license counts page shows how many active licenses each trade has in your county.
Contractors Near Me is a free request service, not a contractor, and we do not bid on work or take a side between bids. If you would like to talk through what you have, call us.
Tell us about the project
Would you like to talk through the bids on your worksheet? Describe the job and what the quotes cover. We phone or email you back; the request is free.
Bid comparison questions
Should I always choose the lowest bid?
No. The FTC advises not to choose the lowest bidder automatically, and California's licensing board warns that a bid far below the others may hide a mistake, missing work or lower-grade materials. Compare what each bid includes first, then the price.
Does the bid worksheet send my numbers anywhere?
No. The worksheet runs entirely in your browser. Nothing you type in it is sent to us, saved or counted, and reloading the page clears it. Only the separate request form on this page sends anything, and only when you press its button.
What should I do when two bids describe the job differently?
Write one scope that says what you want, with the finishes and the items that stay, and send it to every contractor for a revised bid. Until the bids price the same job, the difference between their totals tells you little.
Sources: CSLB, How Do I Find the Right Licensed Contractor?, Contracts and Binding Agreements and Check A License; Federal Trade Commission, How To Avoid a Home Improvement Scam; U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025; TDLR, License Search; Texas State Board of Plumbing Examiners. All read November 4, 2026.