Building permit cost: how Bay Area and DFW cities set their fees

A building permit's cost depends on the city and how it measures the job. San José's FY 2026-27 schedule charges a single-family alteration of up to 750 square feet $211 to issue, $1,137 for plan review and $1,732 for inspection. Texas bars cities from basing a home permit fee on the work's cost; San Francisco still prices by valuation.

AI illustration, not a photo of a real project: neatly rolled blank blueprint paper rolls tied with string on a new wood workbench in a clean finished garage, calm light
AI illustration Not a photo of a real project.

Sources: City of San José, FY 2026-27 Building and Structure Permits Fee Schedule (effective August 2026); San Francisco Department of Building Inspection, Table 1A-A, Building Permit Fees (July 2026); City of Dallas, Planning and Development Permit Fee Schedule (effective July 1, 2025); City of Fort Worth, Ordinance 26-28781 fee schedule (effective October 1, 2026). Read November 4, 2026. Label: official.

Why the same project gets different permit fees

Every city sets its own building fees, but state law shapes how. In California, a city's fees for building permits and inspections may not exceed the estimated reasonable cost of providing the service, unless two-thirds of voters approve more (California Government Code §66014). Within that limit, cities choose their own yardstick: San José prices most home work by floor area and by staff hours, while San Francisco prices it by the declared value of the work.

Texas went further in 2019. When a city sets a building permit or inspection fee for building or improving a home, it may not consider the value of the home or the cost of the work, and it may not require you to disclose that cost to get a permit, except where FEMA's flood insurance program requires it (Texas Local Government Code §214.907, added by HB 852). That is why Dallas and Fort Worth price home alterations by the dwelling and by the number of trades, and new homes by square footage.

San José: fees by floor area and by the hour

San José's schedule sets three parts for each permit: permit issuance, plan review and inspection. Each part is the amount in the table or the hourly rate for the time spent, whichever is greater: $211 an hour for permit processing, $325 an hour for plan review and $315 an hour for inspection.

San José, single-family residential fees, FY 2026-27 schedule
Work and sizePermit issuancePlan reviewInspection
Addition or alteration, 0 to 750 sq ft$211$1,137$1,732
Addition or alteration, 751 to 2,250 sq ft$422$1,950$2,520
Addition or alteration, over 2,250 sq ft$633$2,925$3,622
New home, 0 to 1,000 sq ft$844$2,600$4,410
New home, 1,001 to 3,000 sq ft$1,266$4,875$5,355
ADU, new or alteration, 0 to 750 sq ft$422$1,137$1,732
ADU, new or alteration, 751 to 1,200 sq ft$633$1,950$2,520
Exterior or site alteration (deck, porch, windows, shed)$211$325$367, or $682 with a trade permit

A few more lines from the same schedule matter for remodels:

San Francisco: fees by the value of the work

San Francisco's Department of Building Inspection adds a plan review fee and a permit issuance fee, both scaled to the job's valuation. For work valued between $50,001 and $200,000, plan review is $1,617 for the first $50,000 plus $15.60 for each additional $1,000, and permit issuance is $677 for the first $50,000 plus $4.83 for each additional $1,000. The table applies to permits issued on or after July 12, 2026. Because the fee rises with the declared value, the scope and valuation written on the application drive the permit cost.

Dallas: per home and per trade

Dallas's fee schedule, effective July 1, 2025, prices alterations and repairs of single-family and duplex buildings at $181 per dwelling unit plus $100 for each additional trade (Table B-II). A kitchen remodel that brings in plumbing and electrical work therefore pays the base fee plus the trade additions, whatever the cabinets cost. New single-family homes are priced by square footage under Table A-I: for a home of 701 to 2,350 square feet, the fee is the square footage times 0.34569, plus $300.

Fort Worth: a minimum by the number of trades

Fort Worth's fee ordinance, effective October 1, 2026, sets the minimum residential remodel permit fee by the number of trades the project needs: $119 for one trade, $238 for two, $357 for three, $476 for four and $595 for five (Table IA-1). Every permit also carries a $33.08 application fee and a $16.87 technology fee (Table 1-B). The city lowers the permit fee when a third party does the plan review or inspections.

One project, four fee tables

Take a kitchen remodel of about 200 square feet in a single-family home, with new plumbing and electrical work. This is how each schedule would describe its fee lines. We do not total them: your city adds plan revisions, re-inspections and other charges that depend on details, and only its own estimate is reliable.

Fee lines each city's schedule applies to the same kitchen remodel
CityHow the schedule measures itLines quoted from the schedule
San JoséFloor area, with hourly minimums; inspection capped for kitchen remodelsAlteration, 0 to 750 sq ft: $211 issuance, $1,137 plan review, $1,732 inspection; construction taxes on valuation
San FranciscoDeclared value of the workPlan review and issuance from Table 1A-A for the job's valuation tier
DallasPer dwelling, plus each added trade$181 per dwelling unit, plus $100 for each additional trade
Fort WorthMinimum by number of tradesIf the city counts building, plumbing and electrical as three trades: a $357 minimum, plus $33.08 application and $16.87 technology fees

Costs a building fee schedule leaves out

How permit costs should show up in a bid

Ask each contractor to list the permit as its own line, say whether the figure is the city's fee or an allowance, and say who applies for it. The Federal Trade Commission counts a contractor asking you to get the required permits yourself among the warning signs of a home improvement scam (FTC, How To Avoid a Home Improvement Scam). When you line bids up on the bid worksheet, a missing permit line is one of the first gaps to ask about. The steps of the permit process itself are on our page about building permits explained.

Contractors Near Me is a free request service, not a contractor, and we do not apply for permits. To talk through what your project may need, call us.

Call (408) 675-1844

Tell us about the project

Not sure what your permit will involve, or who should pull it? Tell us the project and the city. We phone or email you back; the request is free.

Building permit cost questions

Why can't Texas cities charge permit fees based on what my remodel costs?

Since 2019, Texas Local Government Code §214.907 has barred cities from considering a home's value or the cost of building or improving it when they set a building permit or inspection fee, and from requiring you to disclose that cost, except for FEMA flood insurance purposes. Cities price by dwelling, trade or square footage instead.

Can a California city charge more for a permit than the work costs it?

Not without voter approval. California Government Code §66014 says building permit and inspection fees may not exceed the estimated reasonable cost of providing the service, unless two-thirds of voters approve a higher fee. Cities still choose how to measure that cost, by valuation, floor area or staff time.

Are construction taxes part of the permit fee in San José?

They are collected at the same time but listed separately. San José's FY 2026-27 schedule lists construction taxes figured on the building valuation, 2.42 percent and 1.54 percent for residential use under two city taxes, plus flat per-unit taxes. Ask the city which apply to your project.

What permit costs are not in a city's building fee schedule?

School and other impact fees, planning review, fire review, utility or sewer connection charges and the drawings the city requires often sit outside the building fee table. Re-inspections after a failed inspection are extra too; San José charges $315 an hour for them.

Sources: City of San José, FY 2026-27 Building Division Fee Schedule (PDF); San Francisco DBI, Table 1A-A, Building Permit Fees; City of Dallas, Planning and Development Permit Fee Schedule (PDF, effective July 1, 2025); City of Fort Worth, Ordinance 26-28781 fee schedule (PDF, effective October 1, 2026); Texas Legislature, Local Government Code §214.907; California Legislature, Government Code §66014; Federal Trade Commission, How To Avoid a Home Improvement Scam. All read November 4, 2026.